Red Wing Solid Waste Facility
Reconstruction Project #17206
Report Date: 10/21/2019
The reconstruction of the buildings at the Solid Waste Facility that were lost to fire in June of 2017 continues.
During the weeks of October 14 through October 18, 2019 . . .
- LS Black caulking door frames.
- Ironworkers continue detail work throughout and install liner panels in Maintenance-Parts and Riser Room.
- Bolander saw cutting pavement.
- Pinnacle framing walls at Tip Floor and admin perimeter and installing drywall.
- Pinnacle installing insulation at framed walls surrounding Conveyors 1 & 2.
- Parker Electric installing electrical components throughout as needed.
- Ryan continued installing plumbing in Maintenance-Parts, lunchroom, and hydrant.
- Ryan began layout for air and gas piping and installing sanitary, vent, and water lines to restrooms
- Sylvander installing connections to heating units in the Mezzanine.
- Overhead Door began installing tracks and doors at the Loadout areas.
A reminder to our customers and visitors – the construction zone is located in areas of the Waste Campus that have been typically accessible to customers. Signs have been installed to provide direction. All customers and visitors are asked to stop in the office before proceeding further into the Campus.