Red Wing Solid Waste Facility
Reconstruction Project #17206
Report Date: 07/01/2019
The reconstruction of the buildings at the Solid Waste Facility that were lost to fire in June of 2017 continues.
During the week of June 24 through June 28, 2019 . . .
- Contractor stripped forms from the Tipping Floor concrete walls, formed walls and floor slabs for the RDF area, and poured concrete for the pile caps.
- Contractor backfilled pipe caps.
- Plumbers verified and adjusted floor drain heights at the NW concrete slab.
A reminder to our customers and visitors – the construction zone is located in areas of the Solid Waste Campus that have been typically accessible to customers. Signs have been installed to provide direction. All customers and visitors are asked to stop in the office before proceeding further into the Campus.