Red Wing Solid Waste Facility
Reconstruction Project #17206
Report Date: May 7, 2019
The reconstruction of the buildings at the Solid Waste Facility that were lost to fire in June of 2017 has begun.
During the week of April 29 through May 3:
- Completed pile driving in the recyclables loadout area, then relocated to the north wall of the RDF (refuse-derived fuel) loadout area.
- Started excavating for footings at the north wall of the recyclables loadout area.
- Continued forming for concrete walls.
A reminder to our customers and visitors – the construction zone is located in areas of the Solid Waste Campus that have been typically accessible to customers. Signs have been installed to provide direction. All customers and visitors are asked to stop in the office before proceeding further into the Campus.