Red Wing Solid Waste Facility
Reconstruction Project #17206
Report Date: April 15, 2019
The reconstruction of the buildings at the Solid Waste Facility that were lost to fire in June of 2017 has begun.
During the week of April 8 through April 12:
- Finished saw cutting the existing concrete foundation wall, and began to cut the door openings on the west wall.
- Started laying out and forming the west concrete wall at the tipping floor and installed scaffolding.
A reminder to our customers and visitors – the construction zone is located in areas of the Solid Waste Campus that have been typically accessible to customers. Signs have been installed to provide direction. All customers and visitors are asked to stop in the office before proceeding further into the Campus.