[ARCHIVED] Red Wing Solid Waste Facility Reconstruction Project

Image of the conveyor concrete pour for grade beams, taken 06/13/19 during the Solid Waste Campus re

Red Wing Solid Waste Facility

Reconstruction Project #17206

Report Date: 06/17/2019


The reconstruction of the buildings at the Solid Waste Facility that were lost to fire in June of 2017 continues. 

During the week of June 10 through June 14, 2019 . . .

  • Ironworkers begin placing rebar for grade beams at the Recyclables Loadout area.
  • The contractor continues forming the tipping floor walls and finalize formwork at the Recyclables Loadout area and poured concrete for the grade beams.
  • Masons continue laying block walls and grouting along the Conveyor Corridor and begin laying block walls around the offices.

A reminder to our customers and visitors – the construction zone is located in areas of the Solid Waste Campus that have been typically accessible to customers.  Signs have been installed to provide direction.  All customers and visitors are asked to stop in the office before proceeding further into the Campus.